We exist because $40M+ delays are still tracked in Excel.
Plenumly was built after watching a developer lose nine figures of revenue across two sites because a transformer slipped 90 days and nobody on the procurement side surfaced it until construction called. The reservation was tracked. The schedule was tracked. The reconciliation between them was not.
That gap, between a manufacturer's slot date and a project's need-by date, is the most expensive blind spot in data center development. It is the gap we close.
We are a small team based in San Francisco, building deliberately and slowly with one design partner before we open up. If you are a developer with 5+ active sites and you have felt this pain, we would like to talk.